Musicbed
Filmsupply
Stills
Contact Us(800) 805-6802

Acreage Stock Video Footage

Licenses 2183 high quality Acreage stock video clips in 4K, raw formats

Daytime Aerials In New Jersey During Summer

NEXUS

Haloa - Images of Hawaiian Landscapes and Culture

Nick Fitzhugh

New England Aerials

NEXUS

Vertical Footage of the City

Amnesty Films

Freedom in the Sky - Woman Paramotoring

Josh Heinrich

Man lies down among field of flowers on windy day as vehicle drives by
Framed by an open truck door, a woman sits in a golden hour field smelling and picking wildflowers
Wasp nest with swirling structure hanging from branch with dry leaves against black background
A farmer drives a tractor down a lane
Aerial View of Lush Green Crop Rows Growing in a Field for Agriculture and Farming
Aerial view of farmland fields and Mayfield Lake with a river flowing through it during summertime in Washington
An aerial view shows a patchwork of flooded fields interspersed with strips of darker vegetated land and a few scattered buildings
Looking straight down from 10,000 feet rotating and following a white car as it drives on a straight rural road flanked by irrigation canal and cubic symmetrical agricultural land
Woman wearing a long dress walks into shallow water as volcanoes erupt along the coast
Blurry horse runs across the landscape under a cloudy sky
Aerial view of a rural neighborhood with houses far apart with open land and trees
A couple holds hands and then embraces while talking to each other and laughing in front of a sunset
An overhead aerial view reveals a sprawling suburban residential neighborhood with numerous houses curving streets and green spaces
Silhouette of a rural house at night

New England Aerials

NEXUS

A woman walks towards the large glowing cube
Luxury homes with vast grassy yards next to an empty field and forest
Farm house and facilities located in the middle of a forest in the mountains
A lone cowboy walks across a snowy hill and stops to survey the vast, frozen landscape below at dusk
Vehicle drives along a highway passing the rural fields bordering a forest on an autumn day
A view of a bain sculpture with paint on it
An aerial view of homes in a neighborhood
A broken down tractor is parked in an open field
Aerial view of farming machinery harvesting crops and loading them into trucks

Vertical Footage of the City

Amnesty Films

Freedom in the Sky - Woman Paramotoring

Josh Heinrich

A large sugarcane plantation with a mountain range in the background on a cloudy day
Portrait of a man outdoors at night on a snowy day
A stunning aerial view of green pastures and farmland surrounded by trees in Belle Mead New Jersey during a sunny summer day
Different colors of crops grow in large fields
A softly lit orange lily blooms against a black background its petals glowing in a warm spotlight
Horses run across an open field landscape
A person is dancing on the hill
The homes are spread out across the land
An aerial view of crops growing in a field
An aerial shot captures a tractor tilling a vast dry brown field leaving a trail of kickedup dust in its wake
Man driving a farm tractor in a foggy pasture
An aerial view looks down on a vast dark green farm field with rows of crops running from the top of the frame down toward the bottom right
Aerial footage approaching an upscale country home surrounded by lush vegetation in Ridgefield Washington during daytime
A creek runs through large fields full of crops
Car drives on a road through the farm fields of a small town in the morning
Aerial view of trees in a remote area
A person stretches and moves while outside in a field surrounded by trees and greenery during the day
Aerial view of green countryside with houses
A colt galloping across the beach sand on a cloudy evening
Farm animals move around on a grassy area near a forest
A cow is outside the barn
Two people wearing dark clothes are sitting on large lightcolored rocks in the desert under a cloudless blue sky
This is a aerial video clip of a rustic farmhouse surrounded by lush fields in Lawrenceville New Jersey on a sunny day
Vintage 8mm film footage captures the progression of a solar eclipse with prominent lens flares and film grain
A car is on fire at night
An aerial drone shot flies over a flat rural landscape with sections of green and brown fields a road runs through the center of the frame with a few houses and buildings visible among the fields and patches of trees
Silhouette of a man in a cowboy hat walking to a wooden fence and leaning on it for a while outdoors during dusk or dawn
A cow with horns rests in a lush green mountain pasture before beginning to graze on the grass
A man stands in an open field and looks into the distance
A woman watches her hose eat grass
Cowboy holding two thin wooden stakes
Black and white footage of a group of men standing in a huddle in a large, overgrown field
Upscale homes surround vast farmlands in Belle Mead New Jersey
A solitary sheep grazes on a hilltop, silhouetted against a dramatic and colorful sunset sky
Aerial view of large segmented fields
A man standing and wearing warm clothes is in a very dark environment that is snowing and he is staring straight ahead
A harvester loads crops into a bin
A building in a rural setting is surrounded by open grassland at midday
A farm with a barn in a silo in a region with large fields of grass and several trees back
Aerials

Need help finding the
right footage?

Have it delivered to your account within 1 business day.

This is Filmsupply

Our StoryOur FilmmakersArticlesFilmsPopular SearchesAll Categories

FM

A family of brands dedicated to empowering the creative.

FILMSUPPLY

Footage licensing for productions

MUSICBED

Music licensing for filmmakers

STILLS

Image licensing for creatives

© 2026 FM LLC.

Privacy PolicyLicense TermsTerms & ConditionsCareers