Musicbed
Filmsupply
Stills
Contact Us(800) 805-6802

Stock Video Footage

Licenses 9000 high quality stock video clips in 4K, raw formats

A gold resort is filmed from above
Men Playing Golf
Tall trees cast shadows on a golf course
An aerial view of people practicing their golf swing at a sports facility during the daytime
The green golf course below is empty
Aerial shot of the golf course empty during the day
Parking lot and buildings sit in field bordering forest
The grass is green in the country
A flag on a pole marks the hold on the green near a sand trap on a golf course
A view of a person hitting a golf ball on a tee
Rolling hills in a golf course
Men Playing Golf
A golf course with a lot of golf carts parked
Traffic passes golf course surrounded by homes as golfers move around
Golfer drives golf cart across golf green
Aerial of a green golf course outdoors during daytime
Aerial view of golf course near shoreline
A pair of people ride a golf cart along a dirt road through a golf course
Aerial view of a golf course
A beautiful view of a citys golf course from the sky with a cityscape visible in the distance
Golfers ride in golf carts on a course
Men Playing Golf
Vehicles parked in a natural area with a house
Cars move through neighborhood of large homes
A vast golf course runs along a highway
Golf course with a us flag at the center surrounded by carts and green areas
People play golf on a course in a suburban area
An aerial view starts above a perfectly manicured golf green and slowly rises to reveal a stunning golf course nestled in a lush, green mountain valley
Aerial view of golf course at day
Person with a golf club taking steps backward on a grass field
The large golf course has a forest behind it
Men Playing Golf
Golfers are playing on a golf course
Golfers practice as tractor mows grass
Aerial of trees and houses in a suburban area in the evening
Aerial drone shot of a golf course next to a forest
An aerial clip of a golf course
A woman golfer practices her putting on a perfectly manicured green, hitting balls from a bucket
A slow ascending aerial view of an empty race track and its facilities surrounded by green fields
Golfer swings at ball driving it over grass
A helicopter is landed up on the top of a green golf course hill
Men Playing Golf
Golfers walk on a golf course
A golf ball rolling across the course toward the hole at midday
A wooded golf course
A house sits amid mostly leafless trees
A birds eye view of Inglewood Golf Club by Lake Washington with partly cloudy skies showing the golf course surrounded by a residential neighborhood water and businesses in Kenmore Washington
People sitting outside at an office park courtyard
Forest and mountains surround valley containing golf course
A putter swings at a golf ball on the green
A golf course is shown on a sunny day
People moving in a field
Top down aerial view of buildings cars and boats near a gravel lot at dusk
A footage of a golf course
Aerial panorama of a farm in a grassy field with trees
Aerial view of a house in the mountains
Aerial of an illuminated park at night in the urban city
Birds eye view of a house with a swimming pool
The edge of golf course on a sunny day
A golf cart with four passengers driving along a paved path bordered by grass and water features
A golf course is shown on a clear day
Men Playing Golf
Aerial view of a house with parked vehicles and boats in a dry open rural area

Need help finding the
right footage?

Have it delivered to your account within 1 business day.

This is Filmsupply

Our StoryOur FilmmakersArticlesFilmsPopular SearchesAll Categories

FM

A family of brands dedicated to empowering the creative.

FILMSUPPLY

Footage licensing for productions

MUSICBED

Music licensing for filmmakers

STILLS

Image licensing for creatives

© 2026 FM LLC.

Privacy PolicyLicense TermsTerms & ConditionsCareers